Weil-McLain sequences of operation
55 sequences for Weil-McLain equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.
Boiler (55)
Startup
- Annual start-up checklist (service technician)
ECO Tec Series 3 - Blower calibration at first startup
ECO Tec Series 3 - Check flame and combustion with instruments
ECO Tec Series 3 - Check flame and combustion with instruments at high fire, low fire and auto
Ultra Series 4 - Closure switch interlock startup sequence
SVF Series 1 - Express Setup Example B wizard order (Combi with two zones)
ECO Tec Series 3 - Final verification checklist at commissioning
EG, PEG - Lighting and operating sequence
SVF Series 1 - Power-up and ignition sequence
ECO Tec Series 3 - Power-up check
SVF Series 1 - Start the boiler
SVF Series 1 - Start the boiler
ECO Tec Series 3 - Start-up check after maintenance
ECO Tec Series 3 - Steam boiler vent damper and thermostat cycle check
EG, PEG - U-Control power-up check
Ultra Series 4 - Vent damper and burner ignition sequence (check)
EG, PEG
Ignition
- EG water boiler 30-75 pilot ignition sequence
EG, PEG Series 7 - Spark-ignited pilot startup and shutdown sequence (EG water boilers)
EG, PEG, Series 7
Heating
- Call for heat through ignition to flame
SVF Series 1 - Circulator operation in direct connect piping
ECO Tec Series 3 - Flame detected and modulation, with retry logic
ECO Tec Series 3 - Flame detected, modulation and priority switching
SVF Series 1 - Space heating call sequence
Ultra Series 4
Domestic hot water
- DHW heating call sequence
Ultra Series 4 - DHW heating sequence
Ultra Series 4 - Preheat and ECO Boost operation on combi models
ECO Tec Series 3
Pump/purge
- AUX PUMP/OUTPUT timing with ANY TT INPUT or ANY BURNER DEMAND
SVF Series 1 - Call-for-heat pump and damper sequence
ECO Tec Series 3 - Fill the system with water and purge air
EG, PEG - Purge air from the hydronic side
ECO Tec Series 3 - Purge air from the water system
SVF Series 1 - Purge air from the water system
ECO Tec Series 3 - Purge air from water system
Ultra Series 4
Freeze protection
- Freeze protection circulator operation
Ultra Series 4 - Freeze protection operation
ECO Tec Series 3
Standby/shutdown
- Annual shut-down procedure
EG, PEG - Demand satisfied and postpurge
SVF Series 1 - Demand satisfied and postpurge
Ultra Series 4 - Demand satisfied, postpurge and interpurge
ECO Tec Series 3 - Postpurge and return to standby
Ultra Series 4 - Standby and maintenance display
SVF Series 1 - Turn off gas to the boiler
SVF Series 1
Other
- Automatic reset external limit restart sequence
ECO Tec Series 3 - Blower speed check firing order
ECO Tec Series 3 - Check flame and combustion, then adjust gas valve
SVF Series 1 - Direct exhaust installation sequence
Ultra Series 4 - Direct exhaust sidewall termination installation sequence
Ultra Series 4 - Direct exhaust vertical termination installation order
Ultra Series 4 - Direct vent installation sequence
Ultra Series 4 - Installation sequence - direct vent vertical concentric
ECO Tec Series 3 - Installation sequence - vertical vent / sidewall air
ECO Tec Series 3 - Supply 60F > Return lockout retry timing
ECO Tec Series 3 - Type 1 additional heat demand delay sequence
Ultra Series 4 - Vent and air pipe installation sequence
Ultra Series 4 - Venturi screw and gas valve torque sequence in conversion
ECO Tec Series 3
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.