Direct exhaust installation sequence

Ultra Series 4

What happens, in order

  1. Install the boiler.
  2. Locate the roof or wall penetration for each termination. Prepare roof penetrations before installing vent piping.
  3. Attach external pipe and fittings as shown in the termination instructions. Vertical terminations use the addendum instructions.
  4. Support vertical runs on the outside of the building with brackets as shown in the termination instructions.
  5. Install vent piping from the boiler to the termination. Put a hanger within 6 in of any upturn. Slope horizontal piping down toward the boiler at least 1/4 in per foot.
  6. Connect the vent piping at the boiler per the manual.

Applies to: Direct exhaust installations using room combustion air

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 26. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.