Weil-McLain · Boiler · Other
Automatic reset external limit restart sequence
What happens, in order
- External limit on J20 pins 3 and 4 opens.
- Boiler shuts down.
- External limit closes.
- Control waits for the restart delay.
- Boiler restarts automatically.
Timings and thresholds
| Item | Value |
|---|---|
| Restart delay after limit closes | 150 seconds |
Applies to: ECO Tec Series 3 all models
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec series 3 condensing gas boiler boiler manual, p. 71. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.