- On a call for heat, the display turns blue for space heating or purple for DHW.
- Start the min/max timers if more than one system is calling. Highest priority starts first.
- Start the circulators for that priority.
- Calculate the target temperature. Begin firing only if sensor temperature is below target.
- Wait for the closure switch.
- Run the blower at purge speed for prepurge.
- Check the min air flow switch.
- After prepurge, move to ignition speed.
- Energize the gas valve and ignition spark for the ignition period.
- Turn off the spark and use the flame rod to check for flame signal.
Applies to: SVF Series 1 firing sequence
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SVF 1500-3000 Series 1 boiler manual, p. 68. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.