Weil-McLain · Boiler · Startup
Start the boiler
What happens, in order
- Turn the boiler ON/OFF switch OFF.
- Read and follow the operating instructions on the boiler (Figure 83, page 91).
- Turn the switch on. The control initializes and follows its normal sequence of operation.
Applies to: Initial and routine startup
Models
SVF 1500SVF 2000SVF 2500SVF 3000
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 boiler manual, p. 88. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.