Purge air from the water system

SVF Series 1

What happens, in order

  1. Connect a hose to the purge valve and route it to a drain where the water can be seen.
  2. Close the boiler or system isolation valve between the purge valve and the fill connection.
  3. Close the zone isolation valves.
  4. Open the quick-fill valve on the cold water make-up line.
  5. Open the purge valve.
  6. Open one zone isolation valve at a time and run water until no air shows, then close it and move to the next zone.
  7. Close the quick-fill and purge valves, remove the hose, and open all isolation valves.
  8. Watch that system pressure rises to the correct cold-fill pressure.
  9. Open the manual air vents one at a time, starting on the lowest floor, until water squirts out with no air.
  10. Open the automatic air vent one turn on diaphragm or bladder tank systems only.
  11. Refill to the correct pressure and check water pH, chloride and inhibitor levels.

Applies to: System purge and fill

Models

SVF 1500SVF 2000SVF 2500SVF 3000

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF Series 1 boiler manual, p. 86. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.