What happens, in order

  1. Connect a hose to the purge valve and route it to a drain where the water can be seen.
  2. Close the boiler or system isolation valve between the purge valve and the fill connection.
  3. Close the zone isolation valves.
  4. Open the quick-fill valve on the cold water make-up line.
  5. Open the purge valve.
  6. Open one zone isolation valve at a time and run water until no air flow is seen, then close it.
  7. Repeat for all zones and for the boiler and its internal piping.
  8. Close the quick-fill and purge valves, remove the hose and open all isolation valves.
  9. Watch system pressure rise to correct cold-fill pressure.
  10. Open manual air vents one at a time from the lowest floor until water squirts out, then close them.
  11. On diaphragm or bladder tank systems, open the automatic air vent one turn.
  12. Refill to correct pressure.

Applies to: ECO Tec Series 3 80/110/150/199

Models

80110150199

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 Condensing Gas Boiler Boiler Manual, p. 130-131. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.