Weil-McLain · Boiler · Standby/shutdown

Demand satisfied and postpurge

SVF Series 1

What happens, in order

  1. When the target temperature or limit setting is reached, the demand is satisfied.
  2. Turn off the gas valve.
  3. Run the blower at ignition speed for postpurge.
  4. Return to standby after purge.

Applies to: SVF Series 1

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 1500-3000 Series 1 boiler manual, p. 68. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.