Weil-McLain · Boiler · Startup
Steam boiler vent damper and thermostat cycle check
What happens, in order
- Make sure the vent damper fully opens before the main burners light. If it does not open fully, do not run the boiler, because flue products including carbon monoxide can enter the living space.
- Lower the thermostat setting so the main burner flames go out and the vent damper closes.
- Repeat the thermostat cycle several times to confirm the vent damper opens and closes with the burners.
- Return the thermostat to its normal setting.
- Set the thermostat heat anticipator to the value shown on the wiring diagram.
Applies to: EG and PEG steam boilers with a vent damper
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain EG/PEG Series 7 Boiler Manual, p. 64. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.