Weil-McLain · Boiler · Ignition
Spark-ignited pilot startup and shutdown sequence (EG water boilers)
What happens, in order
- Standby with no call for heat, the vent damper and circulator are off and no gas flows to the pilot or main valve.
- Call for heat the control monitors boiler temperature and runs only the circulator while it checks whether available hot water meets the demand. If more heat is needed, the sequence continues. A DHW call bypasses this check.
- Vent damper and circulator energize if pilot status is acceptable. When the vent damper end switch closes, pilot ignition starts.
- Pilot ignition the control sparks the pilot and opens the pilot valve in the main gas valve. When pilot flame current is sensed, the spark stops and the main valve opens.
- Pilot retry if the pilot does not light, the pilot valve closes and the spark stops. The control waits 5 minutes and tries again. This repeats until flame is sensed.
- Main burner the control monitors pilot flame current. If the signal is lost, the main valve closes, the spark restarts, and the sequence returns to the call-for-heat step.
- Power loss the pilot and main valves shut off. The sequence restarts at standby when power returns.
- Limit shutdown the main gas valve closes, but the circulator keeps running and the vent damper stays open.
- Thermostat satisfied pilot and main valves close, the vent damper returns to closed, and the circulator stops. The boiler returns to standby.
Timings and thresholds
| Item | Value |
|---|---|
| Pilot ignition attempt before lockout (natural gas) | 15 seconds |
| Wait before next pilot ignition attempt | 5 minutes |
Codes you may see during this
FAULT L1 POLARITY
Applies to: EG water boilers, spark-ignited pilot system
Models
EGPEG
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 boiler manual, p. 35. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.