Weil-McLain · Boiler · Other
Venturi screw and gas valve torque sequence in conversion
What happens, in order
- Install the new venturi with O-ring seated.
- Tighten the three Torx screws to no more than 23 inch-pounds.
- Install the propane orifice in the venturi gas inlet.
- Tighten the swivel nut with two wrenches on the gas pipe.
Timings and thresholds
| Item | Value |
|---|---|
| Venturi Torx screw torque (max) | 23 inch-pounds |
Applies to: Gas conversion
Models
80110150199
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 Boiler Manual, p. 21. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.