Weil-McLain · Boiler · Other
Installation sequence - vertical vent / sidewall air
What happens, in order
- Read this manual and pages 25 through 27 before starting vent/air work.
- Install the boiler where vent and air piping can route to the selected locations.
- Confirm the vertical termination location meets the clearances in the manual figure.
- Use only listed vent materials and add adapters where required; keep lengths within the allowed maximum.
- Prepare the vertical vent penetration and the sidewall air penetration and secure components.
- Terminate the air piping in a 90-degree down-turned elbow and the vent piping in an upward-pointing coupling.
- Install vent and air piping to the terminations, sloping horizontal runs down toward the boiler at least 1/4 in per foot.
- Install pipe supports every 5 ft and a hanger within 6 in of any upturn.
- Insert piping through penetrations and secure the termination fittings.
- Maintain clearances and fit bird screens to both terminations.
Timings and thresholds
| Item | Value |
|---|---|
| Horizontal pipe slope | 1/4 in per foot down toward boiler |
| Pipe support spacing | max 5 ft apart |
| Adjacent air inlets (multiple boilers) | at least 6 in apart |
| Adjacent vent terminations (multiple boilers) | at least 6 in apart |
Applies to: Vertical vent with sidewall air
Models
80/110/150/199 Series 3
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 Boiler Manual, p. 43. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.