Weil-McLain · Boiler · Pump/purge

Fill the system with water and purge air

EGPEG

What happens, in order

  1. Close manual and automatic air vents and the boiler drain cock.
  2. Fill to correct system pressure; typical cold fill for a residential system is 12 psi.
  3. Connect a hose to the purge valve at the drain valve and route it where water can drain and be seen.
  4. Close the boiler or system isolation valve between the purge valve and the fill connection.
  5. Close zone isolation valves.
  6. Open the quick-fill valve on the cold makeup line.
  7. Open the purge valve.
  8. Open one zone isolation valve at a time, let water run until no air flow is seen, then close it and move to the next zone.
  9. Close the quick-fill valve and purge valve and remove the hose.
  10. Open all isolation valves and watch system pressure rise to correct cold-fill pressure.
  11. After operation, bleed residual air with manual air vents.
  12. If no purge valves are installed, open manual vents one at a time starting on the lowest floor and close each when water squirts out.
  13. Open the automatic air vent (diaphragm or bladder tank systems) one turn.
  14. Open other vents starting on the lowest floor until water squirts out, then refill to correct pressure.

Applies to: EG / PEG water boilers

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG / PEG Series 7 boiler manual, p. 57. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.