Annual shut-down procedure
What happens, in order
- Follow the correct operating instructions for the boiler.
- Do not drain the system unless it will be exposed to freezing temperatures.
- If antifreeze is used in the system, do not drain it. Test the antifreeze.
- If the complete boiler and piping system must be drained to prevent freezing, provide a way to drain water from both ends of the boiler at or below the return tapping level.
Applies to: EG and PEG Series 7 boilers
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain EG/PEG Series 7 Boiler Manual, p. 72. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.