Vent and air pipe installation sequence
What happens, in order
- Install the boiler.
- Determine the termination method sidewall or vertical, concentric or separate pipes.
- Determine the wall or roof penetration location for each termination.
- Install the termination assembly as described in this manual.
- Install air and vent piping from the boiler to the termination.
- Install pipe supports and brackets as required.
Applies to: Ultra Series 4 boilers
Models
Ultra-80Ultra-105Ultra-155Ultra-230Ultra-299Ultra-399
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual, p. 66-67. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.