Vent and air pipe installation sequence

Ultra Series 4

What happens, in order

  1. Install the boiler.
  2. Determine the termination method sidewall or vertical, concentric or separate pipes.
  3. Determine the wall or roof penetration location for each termination.
  4. Install the termination assembly as described in this manual.
  5. Install air and vent piping from the boiler to the termination.
  6. Install pipe supports and brackets as required.

Applies to: Ultra Series 4 boilers

Models

Ultra-80Ultra-105Ultra-155Ultra-230Ultra-299Ultra-399

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual, p. 66-67. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.