Weil-McLain · Boiler · Other
Direct exhaust vertical termination installation order
What happens, in order
- Install the boiler.
- Locate the wall or roof penetration for each termination.
- Prepare roof penetrations before installing vent piping.
- Attach the external pipe and fittings as the termination instructions show.
- Install the termination as described in the manual.
- Support vertical runs outside the building with brackets as the termination instructions show.
- Install vent piping from the boiler to the termination.
- Install a hanger within 6 inches of any upturn in the piping.
- Install pipe supports every 5 feet on horizontal and vertical runs.
- Slope horizontal piping toward the boiler at least 1/4 inch per foot.
- Connect the vent piping at the boiler as described in the manual.
Applies to: Ultra direct exhaust vertical venting
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist at commissioning · Startup
- Lighting and operating sequence · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 89. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.