Weil-McLain · Boiler · Other

Direct exhaust vertical termination installation order

Ultra Series 4

What happens, in order

  1. Install the boiler.
  2. Locate the wall or roof penetration for each termination.
  3. Prepare roof penetrations before installing vent piping.
  4. Attach the external pipe and fittings as the termination instructions show.
  5. Install the termination as described in the manual.
  6. Support vertical runs outside the building with brackets as the termination instructions show.
  7. Install vent piping from the boiler to the termination.
  8. Install a hanger within 6 inches of any upturn in the piping.
  9. Install pipe supports every 5 feet on horizontal and vertical runs.
  10. Slope horizontal piping toward the boiler at least 1/4 inch per foot.
  11. Connect the vent piping at the boiler as described in the manual.

Applies to: Ultra direct exhaust vertical venting

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 89. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.