Two-stage variable speed furnace heating with two-stage thermostat

EL296UHVSL280UHVSL280UHNVSL297UHNV

What happens, in order

  1. Thermostat first-stage heat call closes; control self-checks, confirms limits closed and pressure switches open
  2. Inducer starts on low speed
  3. When the low pressure switch closes, a 15 second pre-purge runs on low speed
  4. If the low fire pressure switch does not close, the inducer goes to high fire; after the 15 second pre-purge the high fire switch closes and the furnace starts on high fire, then drops to low fire after 10 to 20 seconds
  5. 20 second ignitor warm-up follows, inducer stays on low
  6. Gas valve opens on low fire and ignition occurs; the 30 second blower on-delay starts at the same moment
  7. Blower starts on low heat speed; HUM contacts and the 120 V ACC terminal are energized
  8. Second-stage call a 30 second recognition delay runs, then the inducer goes to high speed, the control checks the high fire pressure switch, the high fire gas valve opens and the blower moves to high heat speed
  9. Second stage satisfied inducer drops to low, high fire valve closes, blower goes to low heat speed
  10. First stage satisfied gas valve closes, 5 second low-speed post-purge, and the selected blower off delay starts
  11. After post-purge the inducer, HUM and ACC terminals drop; the blower stops at the end of the off delay

Timings and thresholds

ItemValue
Pre-purge15 s low speed
Ignitor warm-up20 s
Trial for ignition4 s
Blower on delay30 s
Second-stage recognition delay30 s (communicating thermostat 15 to 45 s)
Post-purge5 s low speed
Blower off delay60, 90 (factory), 120 or 180 s by dip switches 3 and 4

Codes you may see during this

E223 E224 E227 E250 E270 E271 E272 E273 E274 E275

Applies to: Two-stage variable-speed Lennox furnaces with dip switch 1 OFF (two-stage thermostat)

Models

EL296UHVSL280UHVSL280UHNVSL297UHNV

More Lennox furnace sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Lennox SL280UHV installation manual 508245-01 (04-2024), Heating Sequence of Operation p.46; Lennox SL280UHNV service manual Corp 1601-L8 (rev 04-2024), Sequence of Operation; Lennox SL297UHNV installation manual 507760-02 (02-2018), Heating Sequence of Operation pp.51-52; Lennox EL296UHV installation manual, Ignition and Two Stage Operation pp.27-28. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.