Weil-McLain · Boiler · Startup
Startup procedure
What happens, in order
- Turn the boiler ON/OFF switch off.
- Read and follow the operating instructions on page 85 (Figure 78).
- Turn the boiler on. The control initialises and follows its normal sequence of operation.
- Check flame and combustion with instruments at high fire.
- Run the boiler for 10 minutes before measuring gas input.
- Measure natural gas input and compare against the rating label.
- Check low fire flame stability in Manual test mode.
- Set the firing rate back to AUTO when testing is complete.
- Complete the verification checklist before leaving the boiler.
Timings and thresholds
| Item | Value |
|---|---|
| Burn-in before gas input measurement | 10 minutes |
Codes you may see during this
Applies to: SlimFit Series 2 startup
Models
SF1000SF1500SF2000
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SlimFit Series 2 boiler manual 550-100-561/1225, p. 82-84. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.