Weil-McLain · Boiler · Startup

Final verification checklist

CGi Series 5

What happens, in order

  1. Confirm boiler and heat distribution units are filled with water and automatic air vents (if used) are open one full turn.
  2. Purge air from the system and from the gas piping; check gas piping for leaks.
  3. Confirm correctly sized manifold orifices are installed per the orifice table for size and fuel type.
  4. Start the boiler per the operating instructions and observe proper burner flames.
  5. Test temperature limit, low water cutoff, field-installed controls and the ignition safety device.
  6. Measure natural gas input and check manifold gas pressure.
  7. Set the boiler temperature to system requirements, adjust balancing valves, and set Economy mode.
  8. For multiple zones, balance flow so it is about the same in each zone.
  9. Cycle the boiler with the thermostat at highest and lowest settings and verify it starts and stops correctly.
  10. Cycle the DHW aquastat if used.
  11. Observe several operating cycles, set room thermostat, complete the installation certificate, and review instructions with the owner.

Applies to: CGi Series 5 commissioning

Models

CGi-25 to CGi-8

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 boiler manual, p. 66. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.