Weil-McLain · Boiler · Startup

Closure switch (flow switch or CAD) proof sequence

SlimFit Series 2

What happens, in order

  1. On a call for heat, the corresponding outputs energize.
  2. The blower does not start until the proof of closure switch closes and conducts.
  3. If the switch opens before ignition, the timer keeps running and the blower stays active.
  4. If the switch is still open after the timeout, the control locks out.
  5. If the switch opens during burner firing, the control locks out.
  6. The lockout clears when the closure switch returns to closed.
  7. The outputs stay energized while the control tries to close the switch.

Timings and thresholds

ItemValue
Time allowed for closure switch to close4 minutes

Applies to: Flow switch or combustion air damper interlock on P11 jumper

Models

SF1000SF1500SF2000

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit Series 2 boiler manual 550-100-561/1225, p. 56. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.