NTI sequences of operation
14 sequences for NTI equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.
Boiler (14)
Startup
- Combustion checking procedure
TRX - Power-on and mode sequence
TRX - Power-up and what lets the boiler start a call
Trinity Tft
Ignition
- Failed ignition and lockout
TRX150 - First ignition start-up
TRX - Light-off sequence and retries
Trinity Tft
Heating
Domestic hot water
- Indirect tank (DHW) call
Trinity Tft
Pump/purge
- Circulator outputs and their fuses
Trinity Tft
Freeze protection
Standby/shutdown
- Demand satisfied and shutdown
Trinity Tft - Normal shutdown
TRX150
Other
- Lead-lag (cascade) demand handling
Trinity Tft - Safety stops, holds and lockouts
Trinity Tft
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.