  1. Press the ON/OFF button to power on the boiler.
  2. Boiler enters standby.
  3. On a CH request the display shows the supply temperature.
  4. On a DHW request the display shows the DHW setpoint.
  5. A purging cycle runs before ignition.
  6. After CH or DHW operation, the circuit post circulation runs.

Applies to: TRX150

Models

TRX150

More NTI boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: NTI TRX150 manual, p. 63. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.