What happens, in order
- Power is switched on at the breaker and the switch on the front of the boiler
- Display opens on the Summary page showing demand source, burner state, sensors and pumps; any active alert or lockout is shown
- Control looks for a call CH1 (24 VAC from R through a dry contact), CH2 lead-lag input, or DHW (contact closed between terminals 6 and 9)
- 24 VAC from R must reach LIM (factory jumper) and the rest of the ILK string including the internal low water cutoff must be closed, otherwise the burner stays off and Lockout 67 ILK OFF is shown
- Burner switch must be on in the controller; if it is off the Summary page says burner switch off
- Burner will not start while an anti short-cycle hold (Hold 61) is counting or while safety settings are waiting for verification (Lockout 2)
- Burner will not start while outlet temperature is above setpoint minus on-hysteresis
- If all of that is satisfied the control goes to the ignition sequence
Timings and thresholds
| Item | Value |
|---|---|
| Lockout and alert history kept | 15 of each |
Codes you may see during this
Hold 61, Hold / Lockout 67, Lockout 2
Applies to: Trinity Tft60, Tft85, Tft110, Tft155, Tft175, Tft200, Tft250, Tft300, Tft399
Models
More NTI boiler sequences
- Combustion checking procedure · Startup
- Power-on and mode sequence · Startup
- Failed ignition and lockout · Ignition
- First ignition start-up · Ignition
- Light-off sequence and retries · Ignition
- Central heat call (CH1) from call to satisfied · Heating
- Indirect tank (DHW) call · Domestic hot water
- Circulator outputs and their fuses · Pump/purge
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: NTI Tft60-399 Installation and Operation Instructions (rev. 2012-04-09), Sec. 8.0 Lighting, Sec. 10.0 Piping, Sec. 15.0 Troubleshooting. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.