What happens, in order

  1. Thermostat or aquastat opens or the setpoint plus off hysteresis is reached
  2. Gas valve closes and flame goes out
  3. Combustion blower runs its post-purge
  4. Blower should then be idle; a blower running at high speed with the burner off points to a loose signal cable or missing 24 VAC at the control
  5. Before servicing wait for the post-purge to finish, then shut off gas and power

Codes you may see during this

Hold / Lockout 67

Applies to: Trinity Tft60, Tft85, Tft110, Tft155, Tft175, Tft200, Tft250, Tft300, Tft399

Models

Tft60Tft85Tft110Tft155Tft175Tft200Tft250Tft300Tft399

More NTI boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: NTI Tft60-399 Installation and Operation Instructions (rev. 2012-04-09), Sec. 8.0 Lighting, Sec. 10.0 Piping, Sec. 15.0 Troubleshooting. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.