NTI · Boiler · Freeze protection

Freeze protection stages

TRX

What happens, in order

  1. Stage 1 when NTC1 or NTC2 water temperature is 39°F to 46°F, the internal pump runs at high speed.
  2. Stage 1 the 3-way valve alternates 1 minute heating, 1 minute DHW until temperature reaches 46°F or more.
  3. Stage 1 if conditions last 20 minutes, go to Stage 2.
  4. Stage 2 when temperature is below 39°F, the burner fires at minimum power.
  5. Stage 2 the 3-way valve sits on DHW and switches every 30 seconds between CH and DHW.
  6. Stage 2 burner turns off at 104°F and the boiler holds 95°F to 104°F for 45 minutes.
  7. Stage 2 after 45 minutes, 2 minutes of post-heating circulation.
  8. Stage 2 if temperature falls below 46°F within 150 minutes, the burner restarts immediately.

Timings and thresholds

ItemValue
Stage 1 duration before Stage 220 minutes
Stage 1 valve switching1 minute heating / 1 minute DHW
Stage 2 valve switching30 seconds CH / DHW
Stage 2 hold time 95°F to 104°F45 minutes
Post-heating circulation2 minutes
Restart window150 minutes

Applies to: TRX boilers

More NTI boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: NTI TRX150 manual, p. 14. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.