Weil-McLain · Boiler · Standby/shutdown

Shutdown when thermostat is satisfied or limit trips

CGi Series 5

What happens, in order

  1. When the thermostat opens, the pilot and main gas valves close.
  2. The inducer runs for a 15-second postpurge.
  3. The circulator shuts off.
  4. If a limit control shuts the boiler down, the gas valves close and the inducer runs a 15-second postpurge while the circulator keeps running.
  5. The boiler is now in the off cycle.
  6. Repeat the call-for-heat cycle several times to verify operation, then return the thermostat to its normal setting.

Timings and thresholds

ItemValue
Postpurge after thermostat satisfied15 seconds
Postpurge after limit shutdown15 seconds

Applies to: CGi Series 5 boilers

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 Boiler Manual, p. 45. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.