Weil-McLain · Boiler · Other

Propane conversion procedure

SVF 500/600 Series 1

What happens, in order

  1. Shut off power to the boiler and close the external manual gas shut-off valve.
  2. Allow the boiler to cool if it has been running.
  3. Take the propane orifice plate and propane venturi from the kit and check the orifice stamping and sizes.
  4. Make a coarse gas valve throttle adjustment: open fully, then close 4 and 7/8 turns.
  5. Remove the two top panels and the side panels for access.
  6. Remove the four bolts holding the silencer to the venturi.
  7. Disconnect the gas flex line from the inlet pipe of the automatic gas valve.
  8. Remove the four bolts holding the gas pipe to the bottom of the venturi and let the gasket come free.
  9. Remove the natural gas venturi and its O-ring from the blower. Discard the natural gas venturi and check the O-ring.
  10. Install the propane venturi on the blower with the gas hookup pointing down and the O-ring seated. Tighten the three nuts.
  11. Install the propane orifice plate between the gas pipe and the venturi side port, between the two square gaskets. Secure the gas pipe.
  12. Install the silencer to the venturi with the four bolts.
  13. Reconnect the gas flex line to the automatic gas valve inlet pipe.
  14. Apply the conversion label next to the rating label.
  15. Reconnect power to the boiler.
  16. Test the boiler fully after conversion, fill out the Fire Test label, start up the boiler and check combustion.

Timings and thresholds

ItemValue
Venturi nuts to blower (three nuts, 120° spacing)87 in-lbs (9.82 Nm)
Gas pipe to venturi (four bolts)44 in-lbs (5.0 Nm)
Silencer to venturi (four bolts)44 in-lbs (5.0 Nm)

Applies to: Propane conversion of SVF 500/600 boilers

Models

SVF 500SVF 600

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 boiler manual, p. 16. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.