Weil-McLain · Boiler · Other
Propane conversion procedure
What happens, in order
- Shut off power to the boiler and close the external manual gas shut-off valve.
- Allow the boiler to cool if it has been running.
- Take the propane orifice plate and propane venturi from the kit and check the orifice stamping and sizes.
- Make a coarse gas valve throttle adjustment: open fully, then close 4 and 7/8 turns.
- Remove the two top panels and the side panels for access.
- Remove the four bolts holding the silencer to the venturi.
- Disconnect the gas flex line from the inlet pipe of the automatic gas valve.
- Remove the four bolts holding the gas pipe to the bottom of the venturi and let the gasket come free.
- Remove the natural gas venturi and its O-ring from the blower. Discard the natural gas venturi and check the O-ring.
- Install the propane venturi on the blower with the gas hookup pointing down and the O-ring seated. Tighten the three nuts.
- Install the propane orifice plate between the gas pipe and the venturi side port, between the two square gaskets. Secure the gas pipe.
- Install the silencer to the venturi with the four bolts.
- Reconnect the gas flex line to the automatic gas valve inlet pipe.
- Apply the conversion label next to the rating label.
- Reconnect power to the boiler.
- Test the boiler fully after conversion, fill out the Fire Test label, start up the boiler and check combustion.
Timings and thresholds
| Item | Value |
|---|---|
| Venturi nuts to blower (three nuts, 120° spacing) | 87 in-lbs (9.82 Nm) |
| Gas pipe to venturi (four bolts) | 44 in-lbs (5.0 Nm) |
| Silencer to venturi (four bolts) | 44 in-lbs (5.0 Nm) |
Applies to: Propane conversion of SVF 500/600 boilers
Models
SVF 500SVF 600
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 boiler manual, p. 16. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.