Weil-McLain · Boiler · Startup

Power-up and standby

SlimFit Series 2

What happens, in order

  1. On power-up, check the boiler model on the power-up screen. If wrong, turn off the boiler and change it (see p. 69).
  2. Confirm each expected sensor is listed. If one is missing, check its wiring, turn off power and restart.
  3. In standby with no calls for heat, the display cycles dots. A wrench symbol replaces this when maintenance is due.

Applies to: SlimFit 1000-2000 Series 2 boilers

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit Series 2 Boiler Manual 550-100-561/1225, p. 62. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.