Weil-McLain · Boiler · Heating
Heating call sequence of operation
What happens, in order
- Standby with no call for heat, the inducer and circulator are off and no gas flows to pilot or main valve.
- On a thermostat call, the control reads boiler temperature and decides whether stored hot water satisfies the demand. The circulator runs alone if it does.
- If more heat is needed, the circulator energizes. If the limit circuit is closed, the inducer starts.
- After the pressure switch proves airflow, the control runs a prepurge.
- The control sparks the pilot and opens the pilot valve in the main gas valve.
- If the pilot does not light in 15 seconds, the pilot valve closes, the spark stops and a 15-second postpurge runs before a new cycle.
- If the pilot lights and flame current is sensed, the spark stops and the main valve opens.
- During burner operation the control watches pilot flame current. If the signal is lost, the main valve closes, the spark restarts and the sequence returns to the prepurge step.
- If power is interrupted, the pilot and main valves close and the sequence restarts at the prepurge when power returns.
- If a limit shuts the boiler down, the pilot and main valves close, the inducer runs a 15-second postpurge and the circulator keeps running.
Timings and thresholds
| Item | Value |
|---|---|
| Prepurge after pressure switch proves airflow | 10 seconds |
| Pilot light trial before lockout cycle | 15 seconds |
| Postpurge after failed pilot | 15 seconds |
| Postpurge after limit shutdown | 15 seconds |
Applies to: CGi Series 5 spark-ignited pilot boilers with Unity CI control
Models
CGi-25CGi-3CGi-5CGi-6 (Figure 30 and 32)CGi-4CGi-7CGi-8 (Figure 31)
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 gas-fired water boiler manual, p. 45. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.