Weil-McLain · Boiler · Heating

Heating call sequence of operation

CGi Series 5

What happens, in order

  1. Standby with no call for heat, the inducer and circulator are off and no gas flows to pilot or main valve.
  2. On a thermostat call, the control reads boiler temperature and decides whether stored hot water satisfies the demand. The circulator runs alone if it does.
  3. If more heat is needed, the circulator energizes. If the limit circuit is closed, the inducer starts.
  4. After the pressure switch proves airflow, the control runs a prepurge.
  5. The control sparks the pilot and opens the pilot valve in the main gas valve.
  6. If the pilot does not light in 15 seconds, the pilot valve closes, the spark stops and a 15-second postpurge runs before a new cycle.
  7. If the pilot lights and flame current is sensed, the spark stops and the main valve opens.
  8. During burner operation the control watches pilot flame current. If the signal is lost, the main valve closes, the spark restarts and the sequence returns to the prepurge step.
  9. If power is interrupted, the pilot and main valves close and the sequence restarts at the prepurge when power returns.
  10. If a limit shuts the boiler down, the pilot and main valves close, the inducer runs a 15-second postpurge and the circulator keeps running.

Timings and thresholds

ItemValue
Prepurge after pressure switch proves airflow10 seconds
Pilot light trial before lockout cycle15 seconds
Postpurge after failed pilot15 seconds
Postpurge after limit shutdown15 seconds

Applies to: CGi Series 5 spark-ignited pilot boilers with Unity CI control

Models

CGi-25CGi-3CGi-5CGi-6 (Figure 30 and 32)CGi-4CGi-7CGi-8 (Figure 31)

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 gas-fired water boiler manual, p. 45. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.