First power-up and essential setup screens
What happens, in order
- Power up the control and read the startup screen.
- Select USE WIZARD (recommended) or SKIP WIZARD.
- Select the control configuration (single boiler is for stand-alone use).
- Confirm the boiler model (SVF 500 or SVF 600) and press ACCEPT.
- Set the essential boiler settings fuel type, altitude, temperature units, WWSD temp, manual reset high limit, and auto daylight savings time.
- Answer the ODT sensor exemption question.
- Start or skip blower calibration. Calls for heat are ignored until calibration is complete.
Applies to: SVF 500/600 Series 1
Models
SVF 500SVF 600
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 88. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.