Fill and purge the system with water

CGi Series 5

What happens, in order

  1. Close the manual and automatic air vents and the boiler drain cock.
  2. Fill to correct system pressure. Typical cold-fill pressure for a residential system is 12 psi.
  3. Connect a hose to a purge valve and route it to a place where water can drain and be seen.
  4. Close the boiler or system isolation valve between the purge valve and the fill connection.
  5. Close the zone isolation valves.
  6. Open the quick-fill valve on the cold water makeup line.
  7. Open the purge valve.
  8. Open one zone isolation valve at a time and run water until no air flow is seen. Close it, then go to the next zone.
  9. Close the quick-fill valve and purge valve, remove the hose, open all isolation valves, and confirm pressure rises to correct cold-fill pressure.
  10. Open the automatic air vent one turn if the system uses a diaphragm or bladder expansion tank.
  11. Vent air at each manual vent, starting from the lowest floor, until water squirts out, then refill to correct pressure.

Applies to: CGi-25 to CGi-8

Models

CGi-25 to CGi-8

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 boiler manual, p. 62. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.