Economy delay before burner start
What happens, in order
- On a call for heat, the control first circulates the hot water already available in the boiler.
- While trying to meet the demand, the control watches boiler temperature changes through the temperature/LWCO sensor.
- If the available hot water does not satisfy the demand, the control shortens the delay and starts the ignition process.
- The economy setting adjusts the start delay between 100% (maximum delay, preferred) and 10% (minimum delay).
- Reduce the economy setting if the heated space becomes uncomfortable.
Timings and thresholds
| Item | Value |
|---|---|
| Burner start delay | Set by economy setting, 10% to 100% of standard delay |
Applies to: CGi-25 to CGi-8
Models
CGi-25 to CGi-8
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 boiler manual, p. 63. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.