Direct vent vertical termination installation sequence

SlimFit Series 3

What happens, in order

  1. Install the boiler.
  2. Determine the wall or roof penetration location for each termination.
  3. Prepare roof penetrations before installing vent and air piping, then attach external pipe and fittings as the termination instructions show.
  4. Install air and vent piping from the boiler to the termination, with a hanger within 6 inches of any upturn.
  5. Slope horizontal piping toward the boiler at least 1/4 inch per foot.
  6. Connect the vent and air piping at the boiler per the manual.

Applies to: Direct vent vertical terminations

Models

SF-550SF-750

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain SlimFit Series 3 boiler manual, p. 42. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.