Weil-McLain · Boiler · Other

Direct vent sidewall termination installation sequence

SlimFit Series 3

What happens, in order

  1. Step 1 Install the boiler.
  2. Step 2 Choose the wall penetration location for each termination and prepare the wall penetrations before installing air and vent piping.
  3. Step 3 Install air and vent piping from the boiler to the termination. Put a hanger support within 6 in of any upturn and slope horizontal piping down toward the boiler.
  4. Step 4 Connect the vent and air piping at the boiler per the manual.
  5. Finish by attaching external pipe and fittings, supporting vertical runs with brackets, and installing the termination assembly as described in the manual.
  6. If using stainless steel pipe, install the required adapter at each boiler fitting.

Timings and thresholds

ItemValue
Horizontal air and vent pipe slopeat least 1/4 in per ft toward the boiler
Hanger support distance from any upturnwithin 6 in

Applies to: Direct vent sidewall termination

Models

SF-550SF-750

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 38. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.