Weil-McLain · Boiler · Standby/shutdown
Demand satisfied and return to standby
What happens, in order
- Demand is satisfied when the temperature reaches target or the limit setting.
- Close the gas valve.
- Run the blower at ignition speed for postpurge.
- Return to standby after purge. Standby shows dots toggling, or a wrench symbol if maintenance is due.
Applies to: SlimFit 550/750 Series 3 with Control
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SlimFit Series 3 boiler manual, p. 66. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.