Weil-McLain · Boiler · Ignition

Closure switch (flow/CAD) proof sequence on a heat call

SlimFit Series 2

What happens, in order

  1. On a heat call, the corresponding output(s) energize.
  2. The blower does not start until the proof-of-closure switch closes and conducts.
  3. If the switch opens before ignition, the timer keeps running and the blower stays on.
  4. If the switch is still open after the four-minute window, the control locks out.
  5. If the switch opens while the burner is firing, the control locks out.
  6. The fault clears when the closure switch returns to closed. The output(s) stay energized to try to close the switch.

Timings and thresholds

ItemValue
Proof-of-closure window4 minutes

Applies to: Flow switch or CAD interlock on P11

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit Series 2 boiler manual, p. 56. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.