What happens, in order

  1. On a call for heat the display turns on with a blue light (space heating) or purple light (DHW). Priority timers start, highest priority first.
  2. Circulators for the priority start based on settings. Target temperature is calculated. If sensor temperature is below target, firing starts.
  3. Wait for the closure switch if used. Blower goes to purge speed for prepurge and the minimum air flow switch is checked.
  4. After prepurge, blower moves to ignition speed. Gas valve opens and ignition spark starts.
  5. Spark stops and the flame sensor checks for flame signal.

Timings and thresholds

ItemValue
Closure switch proof window4 minutes
Ignition failure retries before lockout2 failures

Applies to: SlimFit 1000-2000 Series 2 boilers

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit Series 2 Boiler Manual 550-100-561/1225, p. 62. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.