Weil-McLain · Boiler · Ignition
Call for heat through ignition
What happens, in order
- On a call for heat the display turns on with a blue light (space heating) or purple light (DHW). Priority timers start, highest priority first.
- Circulators for the priority start based on settings. Target temperature is calculated. If sensor temperature is below target, firing starts.
- Wait for the closure switch if used. Blower goes to purge speed for prepurge and the minimum air flow switch is checked.
- After prepurge, blower moves to ignition speed. Gas valve opens and ignition spark starts.
- Spark stops and the flame sensor checks for flame signal.
Timings and thresholds
| Item | Value |
|---|---|
| Closure switch proof window | 4 minutes |
| Ignition failure retries before lockout | 2 failures |
Applies to: SlimFit 1000-2000 Series 2 boilers
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SlimFit Series 2 Boiler Manual 550-100-561/1225, p. 62. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.