Call for heat and ignition sequence (spark-ignited pilot)
What happens, in order
- With no call for heat, the inducer and circulator are off and no gas flows to the pilot or main valve.
- On a call for heat, the control reads the water temperature sensor and decides whether the hot water can satisfy the demand; the circulator runs alone if it can. If more heat is needed, the sequence continues. A DHW call bypasses this step.
- The circulator energizes. If the limit circuit is closed, the inducer starts.
- After the pressure switch proves airflow, the control starts a 10-second prepurge.
- The control sparks the pilot and opens the pilot valve. If the pilot does not light within 15 seconds, the pilot valve closes, the spark stops, and a 15-second postpurge runs before a new cycle starts.
- If the pilot lights and flame current is sensed, the spark stops and the main valve opens.
- While running, the control monitors pilot flame current. If the signal is lost, the main valve closes, the spark restarts, and the sequence returns to the inducer prepurge step.
- If power is interrupted, the pilot and main valves close and the sequence restarts at the inducer step when power returns.
Timings and thresholds
| Item | Value |
|---|---|
| Prepurge after airflow proven | 10 seconds |
| Pilot light trial | 15 seconds |
| Postpurge after failed pilot or limit shutdown | 15 seconds |
Applies to: CGi Series 5 spark-ignited pilot boilers
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 Boiler Manual, p. 45. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.