Weil-McLain · Boiler · Pump/purge
Call for heat and blower prepurge
What happens, in order
- Call for heat detected; display shows BLUE (space heating) or PURPLE (DHW) banner.
- Start min/max timers if more than one system calls; highest priority starts first.
- Start circulators for the priority setup.
- Calculate target temperature; if sensor temp is below target, begin the firing sequence.
- Blower goes to ignition speed for prepurge.
Applies to: SVF control normal cycle
Models
SVF 500SVF 600
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 boiler manual, p. 84. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.