Weil-McLain · Boiler · Pump/purge

Call for heat and blower prepurge

SVF 500/600 Series 1

What happens, in order

  1. Call for heat detected; display shows BLUE (space heating) or PURPLE (DHW) banner.
  2. Start min/max timers if more than one system calls; highest priority starts first.
  3. Start circulators for the priority setup.
  4. Calculate target temperature; if sensor temp is below target, begin the firing sequence.
  5. Blower goes to ignition speed for prepurge.

Applies to: SVF control normal cycle

Models

SVF 500SVF 600

More Weil-McLain boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 boiler manual, p. 84. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.