Weil-McLain · Boiler · Pump/purge
AUX PUMP/OUTPUT start, run and stop
What happens, in order
- In standby with no heat call, the AUX output stays off.
- For ANY TT INPUT options, the output energizes when an input on this boiler closes.
- For ANY TT INPUT BY ITS PRIORITY option, the output energizes only if the closed input's priority has RUN AUX PUMP/OUTPUT set to YES.
- For burner demand options, the output energizes when the boiler gets a heat call and starts pre-purge.
- The output stays energized through burner running and post-purge.
- The output de-energizes after post-purge and post-pump are finished, or after the burner is off and post-purge is complete for BURNER DEMAND.
Applies to: SlimFit SF1000-SF2000 Series 2 boilers, AUX PUMP/OUTPUT operation
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SlimFit Series 2 boiler manual 550-100-561/1225, p. 72. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.