Weil-McLain · Boiler · Pump/purge
AUX PUMP/OUTPUT start, run and stop sequence
What happens, in order
- Standby output is off.
- A TT input closes pre-pump runs and output turns on.
- Pre-purge runs before burner ignition.
- Burner running output stays on.
- Post-purge runs after the burner shuts off.
- Post-pump runs, then output turns off and the boiler returns to standby.
Timings and thresholds
| Item | Value |
|---|---|
| Pre-pump, pre-purge, post-purge and post-pump | Shown in Figure 66 of the manual, no values printed on these pages |
Applies to: SlimFit 1000-2000 Series 2 boilers
Models
SF1000SF1500SF2000
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: SlimFit Series 2 boiler manual 550-100-561/1225, p. 72. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.