Weil-McLain · Boiler · Domestic hot water
Application B3 DHW call and boiler priority timing
What happens, in order
- A DHW call runs the boiler until the Priority 1 Max On Time has elapsed.
- The heat pump can run space heat calls at the same time as the boiler during a DHW call.
- If the boiler receives a space heat call from the heat pump AHS output, the Max On Time timer starts.
Timings and thresholds
| Item | Value |
|---|---|
| Priority 1 Max On Time | Default (see boiler control settings, p. 40) |
Applies to: System Type B, Application B3
More Weil-McLain boiler sequences
- Annual start-up checklist (service technician) · Startup
- Blower calibration at first startup · Startup
- Check flame and combustion with instruments · Startup
- Check flame and combustion with instruments at high fire, low fire and auto · Startup
- Closure switch (flow switch or CAD) proof sequence · Startup
- Closure switch interlock startup sequence · Startup
- Express Setup Example B wizard order (Combi with two zones) · Startup
- Final verification checklist · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: ECO HP Heat Pump – Application Guide, p. 36. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.