Viessmann · Boiler · Startup
Therm-Control low temperature protection during start-up
What happens, in order
- Phase 1 if the set Therm-Control temperature is not reached at the sensor, the control stops the system pump and closes the mixing valve if fitted.
- Phase 1 the burner runs at full fire until the boiler minimum setpoint is reached.
- Phase 2 when the Therm-Control sensor passes the set temperature, the mixing valve opens and boiler flow is increased (example: 50%).
- As return temperature rises, the mixing valve opens further until full flow (100%) is reached.
- Once the setpoint is reached, the control modulates the burner firing rate and weather-responsive water temperature.
Applies to: Vitorond 200 VD2A with Vitotronic Therm-Control
Models
VD2A-125VD2A-160VD2A-195VD2A-230VD2A-270
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: vitorond 200 VD2A technical data manual, p. 15. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.