Viessmann · Boiler · Startup
Initial start-up preparation
What happens, in order
- Confirm the fresh air intake is open and the chimney and flue pipes are connected, sealed and unobstructed.
- Confirm the expansion tank is correctly sized and precharged.
- Fill the heating system with water and bleed all air.
- Pressure test the boiler and piping at no more than 68 psig, with the relief valve removed.
- Remove the test, reinstall the relief valve, and correct any leaks.
- Confirm proper and adequate fuel supply and open the oil shut-off valve.
- Start the burner and check that it cycles on and off on a proper call for heat before leaving the site.
- Perform combustion analysis at the installation site with calibrated equipment and adjust the burner as needed.
Codes you may see during this
Applies to: Vitorond 100 oil-fired boiler
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
- Matching the control unit to a two-stage burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100 installation and service instructions, p. 37, 39-40. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.