Viessmann · Boiler · Startup

Starting up the boiler (single boiler or boiler within a multi-boiler system)

Vitotronic 100 GC1

What happens, in order

  1. Check the heating system pressure on the manometer. If the needle is below the red marker, the pressure is too low: add water or call the heating contractor.
  2. Open the gas shut-off valve (or the oil pipe shut-off valves at the boiler, whichever applies).
  3. Switch on the power supply, for example at the separate fuse or disconnect switch.
  4. Switch on the heating system on/off switch (item 8). The green operating status lamp lights and, after a short time, the boiler temperature shows in the display.
  5. The boiler is now ready for operation.

Applies to: Vitotronic 100, GC1 control unit; in a multi-boiler system only the Vitotronic 100 and its own boiler start up

More Viessmann boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Viessmann Vitotronic 100 GC1 operating instructions, p. 7. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.