Viessmann · Boiler · Startup
Start up the heating system
What happens, in order
- Check the system pressure on the manometer. If the needle is below the red marker, add water or call the heating contractor.
- Open the oil shut-off valves at the boiler, or open the gas shut-off valve.
- Switch on the power supply at the fuse or disconnect.
- Switch on the heating system on/off switch. The green lamp lights and the boiler temperature appears after a short time.
Applies to: Vitocontrol-S, VD2/CT3/CM2
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitocontrol-S, VD2/CT3/CM2 operating instructions, p. 14. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.