Start-up programming sequence
What happens, in order
- Complete all initial wiring checks before applying power.
- Power the control on. The Start-up screen appears on the display.
- Press the button adjacent to OK to enter the Start-up sequence.
- Enter the required values using the rotary dial and function keys.
- Use the start-up programming table for the correct values. Variables shown depend on the system selection.
Applies to: Versatronik 200 system control, all system examples
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 200 installation and operating manual, p. 32, 35, 38. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.