Viessmann · Boiler · Standby/shutdown
Shut down the heating system before service
What happens, in order
- Turn off main power to the boiler, heating system and all external controls. Lock out to prevent accidental restart.
- Close the main oil supply valve near the burner and the one near the tank.
- Disconnect power to the boiler before opening the combustion chamber door.
Applies to: Service shutdown
Models
VR1 2291VR1 27105VR1 33140
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100, VR1 installation and service instructions, p. 45. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.