Viessmann · Boiler · Heating
Mixing valve circuit control response
What happens, in order
- Do not move the mixing valve motor while the supply temperature is within 1°C / 2°F of the set-point (neutral zone).
- If supply temperature falls 1°C / 2°F below set-point, send the open signal to the mixing valve motor.
- If supply temperature rises 1°C / 2°F above set-point, send the close signal to the mixing valve motor.
- The bigger the control difference, the longer each signal pulse and the shorter the pause between pulses.
Timings and thresholds
| Item | Value |
|---|---|
| Neutral zone | ±1°C / 2°F around set-point |
Applies to: Mixing valve heating circuit
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitotronic 300 GW2 installation and service instructions, p. 89. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.