Viessmann · Boiler · Other
DHW tank heating sequence
What happens, in order
- When the DHW tank temperature falls 4.5 F / 2.5 C below setpoint (coding 59 adjustable), the boiler setpoint rises to 36 F / 20 C above the DHW setpoint (coding 60 adjustable).
- With coding 61:0 the DHW pump starts when boiler water exceeds DHW temperature by 12.6 F / 7 C; with 61:1 it starts at once.
- With priority control (coding A2:2) the supply setpoint drops to 32 F / 0 C, the mixing valve closes and heating circuit pumps stop.
- When the tank temperature rises 4.5 F / 2.5 C above setpoint, the boiler setpoint returns to the weather-responsive value.
- The DHW pump keeps running (coding 62) until boiler to DHW difference is under 12.6 F / 7 C, the boiler reaches its weather-responsive value, or DHW exceeds setpoint by 9 F / 5 C.
- With coding 62:0 the pump stops immediately; with 62:1 to 62:15 the switch-off delay is 1 to 15 minutes.
Timings and thresholds
| Item | Value |
|---|---|
| Tank switching differential (factory) | plus or minus 4.5 F / 2.5 C |
| Boiler lead over DHW setpoint (factory) | 36 F / 20 C |
| DHW pump switch-off delay (factory) | 10 minutes (maximum 15 minutes per p. 54) |
| Automatic program lead time before space heating | 30 minutes |
Applies to: Tank temperature control
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 200 KW2 service instructions, p. 53, p. 54. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.